Today in Parliament, Therese asked the Energy Minister to require National Grid to fully publish their assessment so far of Bradwell as a potential landfall site for cables and interconnectors for offshore wind. She said that it must be 'logical to try and prioritise brownfield sites with existing connections to the electricity network' over greenfield sites on the Suffolk coast. Especially as Suffolk is already taking its fair share of future energy production with the construction of Sizewell C. She will continue to demand answers on this.